LinkedIn

Inventory Resource Management: Tasks (Level 3)

  • Providing personnel, material and equipment resource definitions
    • Shall the MES provide definitions of materials, equipment and personnel?
    • How are they named?
    • Are unique notations available?
    • For which products (mapping)?
    • Which resource parameters have to be defined?
    • Who maintains these resource definitions?
    • In which system are they maintained?
    • Are interfaces necessary?
    • How ist he transfer to be carried out?
  • Providing information on resource capability (committed, available, or unattainable)
    • Shall the MES provide information on availability of resources (committed, available, or unattainable)?
    • Who shall receive the information?
    • What is the update cycle of such information?
  • Managing stock sizes and using other means to control the amount of inventory
    • Shall the MES manage and control stock sizes?
    • Which systems contain or need information on stock sizes?
    • Is a central system available?
    • Which information for a warehouse / bin location shall be managed?
    • How is the data management distributed between ERP and MES?
  • Ensuring that requests for acquisition of resources to meet future capabilities are initiated
    • Shall the MES ensure that requirements on resource supply to ensure future demands are initiated?
    • How and in which system are demands generated?
    • Is the process defined?
  • Ensuring that equipment is available for the assigned tasks
    • Where shall be stored which devices are suitable for which tasks?
    • Based on which criteria?
  • Providing information on the location of resources and assignment of resources to areas
    • Are the logistic transportation processes automated?
    • Shall the MES manage or provide information for other systems on location of resources and their assignment to working areas?
  • Collecting information on the current state of personnel, equipment and material resources
    • Shall the MES manage the current status of resources?
    • Which status information shall be managed?
    • What shall the status information be used for?
    • Which state of status information shall be used?
    • Shall the MES visualize the current state of resources?
  • Maintaining personnel qualification test information
    • Shall the MES manage information on staff qualification?
    • What shall the qualification information be used for?
  • Maintaining equipment capability test information
    • Shall the MES manage information on equipment capability (possible applications and technical limitations)?
    • Shall the MES manage information and/or results on inspections regulated by law?
    • What shall the capability information be used for?
  • Managing reservations for future use of resources
    • Shall the MES manage reservations for future use of resources
    • Shall the resource management be part of rough-cut planning or detailed scheduling?
loading...