EN
|
DE
Sitemap
Login
Forgot password?
Not registered yet?
» Login Workspace
Home
About Us
Vision and Mission
Goals
Organisation
Members' Annual General Meeting
Board of Management
Office
Work Areas
Regions
Working Groups
Project Groups
Membership
Advantages of Membership
Application for Membership
Membership Subscription
Member Companies
Associations
Cooperation Agreements
NAMUR Annual General Meeting
NAMUR AWARD
History
Work Areas and
Project Groups
WA 1 Project Planning and Construction
WG 1.1 PCT Engineering Processes
WG 1.3 Information Management and Tools
WG 1.4 Asset Administration Shell
WG 1.7 Production-related Building Automation
WG 1.8 Assembly and Startup Support
WG 1.10 PCS-Engineering
WG 1.12 Modules/Plug and Produce
WA 2 Automation Systems for Processes and Plants
WG 2.1 Process Automation Systems
WG 2.2 Process Operation
WG 2.3 Batch Control
WG 2.4 Manufacturing Operations Management
WG 2.6 Digital Process Communication
WG 2.8 Automation Architectures
WG 2.9 Human Machine Interface
WG 2.12 Process Orchestration Layer
WA 3 Electrical and Instrumentation Technology
WG 3.1 General Sensor Technology
WG 3.2 Flow Rate Measurement
WG 3.3 Weighing and Filling
WG 3.4 Control Valve
WG 3.6 Analyser Systems
WG 3.7 Smart sensors, actuators and communication
WG 3.8 Level Measurement Technology
WG 3.9 Type Testing
WG 3.11 Pressure and Temperature
WG 3.12 Electromagnetic Compatibility
WG 3.14 Low Voltage Technology
WG 3.15 Drive Technology
WG 3.16 Electrical Heating Systems
WA 4 Operation Support and Maintenance
WG 4.1 Asset and Maintenance Management
WG 4.3 Training and Continuing Education
WG 4.5 Functional Safety
WG 4.7 Explosion Protection
WG 4.9 Hazard Alarm Technology
WG 4.15 Mobile Automation
WG 4.18 Automation Security
WG 4.19 Production Related Logistics
WG 4.20 Remote and Autonomous Operation
WG 4.22 IT/OT Convergence
WG 4.23 Robotics
WG 0.1 Communication & Collaboration
Successor Organisations of Project Groups
Activities in China
Recommendations
and Worksheets
Current NENA
NENA GPT
Obsolete NENA
Access Conditions
Publications
News Archive
Press Releases
Press Review
Tools
NAMUR.smart
NENA GPT
MES Wizard
Wiki
Glossary
myNAMUR
Service
Home
About Us
Vision and Mission
Goals
Organisation
Members' Annual General Meeting
Board of Management
Office
Work Areas
Regions
Working Groups
Project Groups
Membership
Advantages of Membership
Application for Membership
Membership Subscription
Member Companies
Associations
Cooperation Agreements
NAMUR Annual General Meeting
NAMUR AWARD
History
Work Areas and
Project Groups
WA 1 Project Planning and Construction
WG 1.1 PCT Engineering Processes
WG 1.3 Information Management and Tools
WG 1.4 Asset Administration Shell
WG 1.7 Production-related Building Automation
WG 1.8 Assembly and Startup Support
WG 1.10 PCS-Engineering
WG 1.12 Modules/Plug and Produce
WA 2 Automation Systems for Processes and Plants
WG 2.1 Process Automation Systems
WG 2.2 Process Operation
WG 2.3 Batch Control
WG 2.4 Manufacturing Operations Management
WG 2.6 Digital Process Communication
WG 2.8 Automation Architectures
WG 2.9 Human Machine Interface
WG 2.12 Process Orchestration Layer
WA 3 Electrical and Instrumentation Technology
WG 3.1 General Sensor Technology
WG 3.2 Flow Rate Measurement
WG 3.3 Weighing and Filling
WG 3.4 Control Valve
WG 3.6 Analyser Systems
WG 3.7 Smart sensors, actuators and communication
WG 3.8 Level Measurement Technology
WG 3.9 Type Testing
WG 3.11 Pressure and Temperature
WG 3.12 Electromagnetic Compatibility
WG 3.14 Low Voltage Technology
WG 3.15 Drive Technology
WG 3.16 Electrical Heating Systems
WA 4 Operation Support and Maintenance
WG 4.1 Asset and Maintenance Management
WG 4.3 Training and Continuing Education
WG 4.5 Functional Safety
WG 4.7 Explosion Protection
WG 4.9 Hazard Alarm Technology
WG 4.15 Mobile Automation
WG 4.18 Automation Security
WG 4.19 Production Related Logistics
WG 4.20 Remote and Autonomous Operation
WG 4.22 IT/OT Convergence
WG 4.23 Robotics
WG 0.1 Communication & Collaboration
Successor Organisations of Project Groups
Activities in China
Recommendations
and Worksheets
Current NENA
NENA GPT
Obsolete NENA
Access Conditions
Publications
News Archive
Press Releases
Press Review
Tools
NAMUR.smart
NENA GPT
MES Wizard
Wiki
Glossary
myNAMUR
Service
News Archive
Press Releases
Press Review
News Archive
In the news archive you will find all the news releases published on the website of
NAMUR
.
2025-03-19
NE196 Information technology standardisation of TBE assets in the field process-related building automation has been revised.
2025-03-10
NE178 ”NAMUR Open Architecture Verification of Request” is newly published
2025-03-05
AK-PRAXIS AK 4.18 Härtung has been revised
2025-02-26
AK-PRAXIS AK 3.6.3 RAMAN in Ex-Zonen has been published in German
2025-02-20
NE196 Information technology standardisation of TBE assets in the field process-related building automation was published
2025-02-15
NAMUR e.V. has a new company address!
2025-01-24
NE167 German edition has been editorially revised
2025-01-21
NE201 Identitiy and Access Management on Automation Devices is newly published
2025-01-21
AK-PRAXIS-AK-4.18-Ethernet-APL-Security Advisory wurde veröffentlicht
2024-12-05
NA082 Measures and Verification Act in a nutshell has been revised
2024-12-05
WG POSITION WG 2.1 OPC-UA has been published
2024-11-13
NA163 IT Security Risk Assessment for Safety-Related PCT Equipment has been revised
2024-11-12
NE167 Common technical delivery conditions (…) has been revised
2024-11-08
AK-PRAXIS PCT Eingangsdokumentation in Brownfield-Projekten has been published
2024-11-08
NE194 NAMUR APC Interface has been released
2024-11-06
AK PRAXIS 1.7 Raumdifferenzdruckmessung TGA Systeme has been revised
2024-10-09
AK PRAXIS 1.3.1 Austausch von Simulationsmodellen in der Prozessindustrie wurde veröffentlicht
2024-09-10
WG POSITION “ State Model Alignment of ISA 88 and Module Type Package” has been published
2024-08-12
NE198 “Contextualization of production data in the process industry” has been newly published
2024-08-12
NE197 “Maintenance Concept instead of EX Hardware Testing” is new published
2024-08-09
NA186 “Interactions and responsibilities of E&I engineering during the construction and commissioning & start-up phases” is new published
2024-07-03
NE193 “An Information Model for Automation Security Engineering” has been newly published.
2024-05-28
NAMUR Recommendation NE168 Requirements for an Ethernet communication system for the field level from AK 2.6 and the APL Task Force has been revised.
2024-05-24
WG-POSITION WA3 “Requirements for the Next Generation of Ethernet APL Field Devices and Components” has been published
2024-04-17
NENA-GPT is available for registered users
1
2
3
4
5
…
21
next